A chippie and a builder can both hang a door, build a deck or frame up a wall. How they charge is where they differ. Carpenters often work by the hour or by the job. Builders on anything sizeable usually give you a fixed price that covers their own time, the subbies they bring in and the materials.
This guide gives you the published rate ranges, a few common carpentry job prices, and the Victorian rules on registration, contracts and deposits that apply once a job gets past $10,000. Rates come from hipages’ carpenter guide (updated 25 August 2026) and builder guide (updated 6 January 2026). Both are national figures. We looked for a Melbourne-only average from a public source and didn’t find one we could rely on. The Victorian rules are from Consumer Affairs Victoria and the Building and Plumbing Commission, checked in October 2026.
Hourly rates: carpenters vs builders
| Who | Published range | Source |
|---|---|---|
| Carpenter, simple jobs (skirting, small fixes) | About $40 an hour | hipages, Aug 2026 |
| Carpenter, kitchens and custom work | About $80 an hour or more | hipages, Aug 2026 |
| Carpenter, built-ins and complex cabinetry | Closer to $120 an hour | hipages, Aug 2026 |
| Builder, smaller jobs | About $90 to $150 an hour | hipages, Jan 2026 |
hipages doesn’t say whether these figures include GST. Ask every tradie to quote with GST shown, so you’re comparing like with like.
On larger projects, hipages says a builder’s time typically makes up around 30% to 40% of the total cost. That’s why you’ll rarely see an hourly rate on a renovation quote. You’ll see a lump sum, often with prime cost and provisional sums for items that aren’t picked yet.
Common carpentry job prices
These are hipages’ national figures from its August 2026 carpenter guide. They’re useful for a sense check, not as a price to hold anyone to.
| Job | Typical price (hipages 2026) |
|---|---|
| Built-in wardrobe, budget | About $1,000 |
| Built-in wardrobe, mid-range | About $2,500 |
| Timber deck, 20 m², treated pine | About $3,200 |
| Timber deck, 20 m², mid-range hardwood | About $7,000 |
| Timber picket fence | About $60 to $180 per metre |
| Pine sleeper retaining wall | About $150 to $250 per m² |
| Straight staircase, MDF | About $900 |
Access, the state of what’s already there and your choice of materials move these numbers more than anything else. A deck on a sloping block with poor access will cost more than the same deck on flat ground.
When a carpenter needs to be registered in Victoria
This is the rule that catches people out. Consumer Affairs Victoria says you must be registered with the Building and Plumbing Commission (BPC) before doing domestic building work worth more than $10,000, counting labour and materials. That applies to carpentry too. Carpenters can register in a limited carpentry class.
Some work needs registration whatever the price, including restumping, reblocking, demolition and removal of a home.
Check the name and registration number on the BPC’s online register before you sign anything. Our guide to checking a tradie shows how to do that in every state.
Contracts, deposits and insurance over $10,000
Once a domestic building job goes over $10,000 in Victoria, the rules tighten. According to Consumer Affairs Victoria:
- Most work over $10,000 needs a major domestic building contract, even if it’s split into smaller jobs.
- The deposit can be no more than 10% if the price is under $20,000, and 5% if it’s $20,000 or more.
- For work over $16,000, the builder must give you a domestic building insurance policy and certificate covering your property before taking a deposit or any other money.
- Progress payments are tied to completed stages, not dates.
Our guide to reading a builder’s quote walks through what the quote and contract should include, line by line.
Why quotes vary
- Scope. “Build a deck” can mean very different things. Size, height, timber, stairs and balustrade all change the price.
- Materials. Treated pine, hardwood and composite are priced very differently.
- Site. Slope, access, and whether old work needs pulling out first.
- Who’s on the job. A builder managing several trades carries costs a sole carpenter doesn’t.
- Paperwork. Permits, inspections and insurance are part of a legitimate price.
How to get a fair price
- Write down the job in detail, with sizes, photos and the materials you want.
- Get two or three written quotes on the same scope.
- Ask whether prices include GST and whether materials are included.
- Check registration for any job over $10,000, and for restumping or demolition at any price.
- Don’t pay more than the legal deposit, and don’t pay before you’ve seen the insurance certificate on jobs over $16,000.
- Get variations in writing before extra work starts.
If the job involves wiring or plumbing as well, our Melbourne electrician cost guide and plumber cost guide cover those trades and the certificates you should receive.
Next step: write a one-page scope for your job, then send it to two or three registered carpenters or builders and ask for itemised quotes that show GST.
Common questions
How much does a carpenter charge per hour in Melbourne?
hipages' carpenter cost guide (updated 25 August 2026) gives a national range of about $40 to $120 an hour, with simple jobs like skirting at the low end and cabinetry and built-in wardrobes nearer the top. We couldn't find a Melbourne-only published average, so get two or three quotes.
How much does a builder charge per hour?
hipages' builder cost guide (updated 6 January 2026) says that for smaller jobs builders charge about $90 to $150 an hour, depending on experience, workload and location. On larger projects it says builders' time typically makes up around 30% to 40% of the total cost, and most builders quote a fixed price.
Does a carpenter need to be registered in Victoria?
For domestic building work over $10,000 (labour and materials), yes. Consumer Affairs Victoria says you must be registered with the Building and Plumbing Commission before doing that work, and carpenters can register in a limited carpentry class. Some work, such as restumping, reblocking and demolition, needs registration whatever the price.
How much deposit can a builder ask for in Victoria?
Consumer Affairs Victoria says the deposit can be no more than 10% if the contract price is under $20,000, and no more than 5% if it's $20,000 or more. For work over $16,000 the builder must give you a domestic building insurance policy and certificate before taking any money.
Sources we checked
- hipages: How much does a carpenter cost? (updated 25 August 2026)
- hipages: How much does a builder cost? (updated 6 January 2026)
- Consumer Affairs Victoria: Becoming a registered building practitioner
- Consumer Affairs Victoria: Deposits and payments for domestic building